Manufacturing & Supply Chain
Production planning, BOM and supply-chain workflows tailored to your factory — from raw material to finished goods, tracked at every step.
Features
Production planning
- Work orders generated from sales orders or stock requirements
- Production scheduling with start/end dates per job
- Capacity view — see machine and labour load before committing dates
- Priority and rescheduling when urgent orders land
Bill of materials (BOM)
- Multi-level BOMs — finished goods down to raw materials and sub-assemblies
- BOM revisions with version history
- Alternate and substitute materials defined per item
- Accurate material requirement calculation per work order
Shop-floor execution
- Job cards issued per work order with operations sequence
- Material issue recorded against each job — no unrecorded consumption
- Finished-goods receipt with quantity and quality status
- Scrap and wastage recorded per job for true costing
- Work-in-progress visibility at any point
Supply chain & procurement
- Purchase planning from BOM-driven material requirements
- Supplier quotations, price comparison and purchase orders
- Goods-received notes matched to orders and bills
- Vendor performance — delivery time and quality tracking
Costing
- Per-job costing — materials, labour and overheads against each work order
- Variance reports — planned vs actual cost per product
- Product profitability from real production data
Our process
Discovery & system design
We study your products and floor processes, then design the BOM structure and work-order flow.
Quotation
Itemised, no surprises.
Implementation
System configured, items, BOMs and opening stock loaded.
Training
Production, store and purchase teams trained on daily routines.
Support & AMC
Ongoing help and annual contracts available.
Frequently asked questions
Can it handle multi-level BOMs?
Yes — finished goods broken down through sub-assemblies to raw materials, with revision history.
How is material issued to production?
Against work orders — every issue is recorded, so consumption is always traceable to a job.
Will we know the true cost per product?
Yes — materials, labour and overheads accumulate per work order, with planned-vs-actual variance.
Does it cover purchasing too?
Yes — BOM-driven purchase planning, supplier POs and goods-received in the same flow.
Too technical?
We will simplify it.
Tell us what your business needs — our engineers will cut through the jargon and recommend the right solution at the right price. No obligation.
Request received!
Thanks — our team will contact you shortly.